Table 5 Quantities of survey price for alternative No. 3

From: Integrated framework for existing building alternatives by the building information modeling

Demolition work

No

Item

Costs

Cost/Unit

Quantity

1

By cubic meter: crushing reinforced concrete and the price includes transporting waste to public landfills

29,798

11.87

2510.40

2

By cubic meter: crushing plain concrete and the price includes transporting waste to public landfills

810

1.50

540.00

3

By flat meter: Breaking mosaic tiles and transporting waste to public landfills

3050

1.30

2346.07

4

By linear meter: crushing the entrance stairs Marble with the transfer of waste to public landfills

23

1.25

18.63

5

By linear meter: crushing the Marble external stairs, including (existing and sleeping) with transporting waste to public landfills

558

1.25

446.4

6

By flat meter: crushing the entrance stairs Marble with the transfer of waste to public landfills

113

1.25

90.105

7

By the flat meter: crushing the clay brick walls and transporting the waste to public landfills

569

1.25

455.075

8

By the cubic meter: crushing the clay brick walls and transporting the waste to public landfills

605

1.50

403.2

9

By the flat meter: crushing the cement brick walls and transporting the waste to public landfills

194

1.50

129.525

10

By the cubic meter: crushing the cement brick walls and transporting the waste to public landfills

50

1.00

50

11

By the flat meter: crushing the Ceramic tiles brick floor and transporting the waste to public landfills

100

1.00

99.58

12

By the flat meter: crushing the Ceramic tiles brick walls and transporting the waste to public landfills

473

1.00

472.73

13

By lamp sum: crushing electrical works and the price includes transporting waste to public landfills

29,074

29,074

1

Total

  

$65,416

 

Quantity of survey

Total

$65,416